Motorists on London Bridge Road from North Palo Verde Boulevard to Hwy 95; on the London Bridge; and on the Island, should allow extra travel time Saturday, April 2, as temporary road restrictions and traffic delays occur during the Havasu Half Marathon.
The half marathon begins at 6:30 a.m. on the Island, extends onto London Bridge Rd. and out to Palo Verde Blvd N, and then concludes at approximately 12:00p.m. at London Bridge Beach Park.
Traffic control devices will be in place for the duration of the race with two-way traffic being maintained along the majority of the racecourse. London Bridge Beach will be closed to vehicles from 4:00 a.m. to 2:00 p.m.
As always, the public is requested to use caution and share the road when runners are present and to obey all traffic signs and traffic control devices when traveling in the area of the racecourse.
Subscribe to our YouTube channel.
We will send you email alerts when the city releases a news article.